You've Chosen
No Work + $0.00
Finishing Option Includes:
You have chosen to receive the slab(s) without any additional work being done.
Flatten Both Sides *PROMOTION* + $53.10
Finishing Option Includes:
• Flattening both sides on our CNC machine to give you level surfaces on both sides.
** Live Edges are not cut/removed during this work.
This option will include Joint & Glue-up if the item is a Table Top with 2 or more slabs that have a straight cut edge shoving them as a set to be jointed/glued together. If you DO NOT want this step done, put "do not glue together" in your order notes.
Any taper or warp listed in the item descriptio will cause the thickness of the slab to be recuded by the amount listed for each side during flattening.
Custom Finishing Terms & Conditions
Completion time varies depending on the product and level of work selected.
• Flattening/Prepare for Finish services are usually completed on single slabs in 3-5 business days.
• Full Finish has a lead time of 3-4 weeks.
• Adding Epoxy Fill to any option, adds an additional 3-5 business days.
• Glue up services adds 2-3 business days.
When flattening/finishing a slab, you agree that the slab will be thinner than the listed thickness.
• If there is bow, cup, or twist listed in the item description, the slab will be at least that amount thinner per side finished. Example: If there is a 3/8" twist in a slab and you want both sides flattened, the thickness will reduce by at least 3/4" or if one side is flattened it will be around 3/8" thinner.
• If there is a taper listed in the item description, the thickness will be reduced by this amount at least on the side the taper is located. Example: If the slab is listed with a 1/4" deep taper on the back side, it will lose at least 1/4" to remove the taper.
There are no discounts available for custom work. Sales, coupon codes, or any other promotional discount will only be applied to the price of the slab.
Custom work is non-refundable. If there is a discrepancy in the slab, we will contact you prior to starting work.
Prep for Finishing *PROMOTION* + $265.50
Choose which side to apply finishing option
Finishing Option Includes:
• Flattening both sides on our CNC machine to give you level surfaces on both sides.
** Live Edges are not cut/removed during this work.
This option will include Joint & Glue-up if the item is a Table Top with 2 or more slabs that have a straight cut edge shoving them as a set to be jointed/glued together. If you DO NOT want this step done, put "do not glue together" in your order notes.
Any taper or warp listed in the item descriptio will cause the thickness of the slab to be recuded by the amount listed for each side during flattening.
Custom Finishing Terms & Conditions
Completion time varies depending on the product and level of work selected.
• Flattening/Prepare for Finish services are usually completed on single slabs in 3-5 business days.
• Full Finish has a lead time of 3-4 weeks.
• Adding Epoxy Fill to any option, adds an additional 3-5 business days.
• Glue up services adds 2-3 business days.
When flattening/finishing a slab, you agree that the slab will be thinner than the listed thickness.
• If there is bow, cup, or twist listed in the item description, the slab will be at least that amount thinner per side finished. Example: If there is a 3/8" twist in a slab and you want both sides flattened, the thickness will reduce by at least 3/4" or if one side is flattened it will be around 3/8" thinner.
• If there is a taper listed in the item description, the thickness will be reduced by this amount at least on the side the taper is located. Example: If the slab is listed with a 1/4" deep taper on the back side, it will lose at least 1/4" to remove the taper.
There are no discounts available for custom work. Sales, coupon codes, or any other promotional discount will only be applied to the price of the slab.
Custom work is non-refundable. If there is a discrepancy in the slab, we will contact you prior to starting work.
Finish Slab *PROMOTION* + $289.10
Choose which side to apply finishing option
Finishing Option Includes:
• Flattening both sides on our CNC machine to give you level surfaces on both sides.
** Live Edges are not cut/removed during this work.
• Finish Sanding the Selected Side and Edges to a 220 Grit.
• Application of one of our Shop Finishes.
This option will include Joint & Glue-up if the item is a Table Top with 2 or more slabs that have a straight cut edge shoving them as a set to be jointed/glued together. If you DO NOT want this step done, put "do not glue together" in your order notes.
Any taper or warp listed in the item descriptio will cause the thickness of the slab to be recuded by the amount listed for each side during flattening.
Straight cuts will be fresh cut, and could be squared up causing possible length reduction. If you do not want straight cuts changed, put "leave straight cuts as is" in your order notes.
Epoxy Wood Filler is NOT included. If you are interested in having cracks and voids filled, please select "send me an epoxy quote".
We will apply a finish of either our Commercial Grade Satin Finish Lacquer or our Rubio Monocoat Natural Oil Finish, which we will choose based on the characteristics of the slab. If you have a preference, please add to your order notes.
When Rubio Monocoat Oil Plus 2C is selected as the finish, the bottom/back side of the piece will be sealed with Satin Lacquer and the Top/Sides will have the Rubio applied. Rubio can be applied to both sides upon request at an additional cost.
Custom Finishing Terms & Conditions
Completion time varies depending on the product and level of work selected.
• Flattening/Prepare for Finish services are usually completed on single slabs in 3-5 business days.
• Full Finish has a lead time of 3-4 weeks.
• Adding Epoxy Fill to any option, adds an additional 3-5 business days.
• Glue up services adds 2-3 business days.
When flattening/finishing a slab, you agree that the slab will be thinner than the listed thickness.
• If there is bow, cup, or twist listed in the item description, the slab will be at least that amount thinner per side finished. Example: If there is a 3/8" twist in a slab and you want both sides flattened, the thickness will reduce by at least 3/4" or if one side is flattened it will be around 3/8" thinner.
• If there is a taper listed in the item description, the thickness will be reduced by this amount at least on the side the taper is located. Example: If the slab is listed with a 1/4" deep taper on the back side, it will lose at least 1/4" to remove the taper.
There are no discounts available for custom work. Sales, coupon codes, or any other promotional discount will only be applied to the price of the slab.
Custom work is non-refundable. If there is a discrepancy in the slab, we will contact you prior to starting work.
The Lumber Shack Reviews

5.0
(326)
"Hands down, the most incredible overall experience! We got exactly what we wanted/needed for an amazing price!! If we ever need another piece of lumber, I know where I'm going. Thanks, Lumber Shack!!"

“Hands down the best source for specialty lumber! Always get exactly what I order, measurements and details are always accurate! Quality service and stable, well packaged materials with prompt shipping. My go to!”

"Amazing product and customer service! I like to woodwork and build furniture myself, and I’m so excited to have found this place for reliable high quality hardwood!"